A pale walking path curves beside the calm Des Plaines River through mostly bare oak woods in late autumn.

Where to Walk the Des Plaines River Near River Grove This Thanksgiving Weekend

The usual walk from River Grove to the river starts at Evans Field, where Bloomingdale Avenue meets Thatcher Avenue. This Thanksgiving weekend that lot is closed. The Forest Preserves of Cook County closed Evans Field on October 26, 2026, for construction that it expects to run through 2027. The trail beside it is also a work zone.

You can still reach the river over the holiday weekend, but the good walking is at either end of town. About a mile of trail north of Irving Park Road was finished in September, and Thatcher Woods sits at the south end. Here's where each one is, what changed, and what's on the calendar from Thanksgiving Day, November 26, through Sunday, November 29.

River Grove's stretch is getting the biggest rebuild on the river

The Forest Preserves put up its alert for the Des Plaines River Trail between Fullerton Avenue and North Avenue on October 1, 2026. It says sections of the trail "will be fully closed during work." The project rehabilitates the old trail and also builds a path on a new alignment, adds boardwalks, and puts signalized crossings at North Avenue and Strieby Drive. The Forest Preserves is aiming to finish at the end of 2027 or shortly after.

River Grove helped make it happen. According to the Forest Preserves' Des Plaines River Trail Improvements page, the Village of River Grove got ARPA grant money from Cook County for the detailed engineering, and the Forest Preserves won a $10 million TAP-L grant for construction. The current closures are the work that money is paying for.

There's a second, shorter notice on the same corridor. A water main project has a trail warning from Ditka Avenue to Herrick Avenue running from November 9, 2026, through May 15, 2027. Warning signs go up whenever crews are on site, and flaggers direct traffic. Jerome Huppert Woods, on Thatcher Avenue south of Fullerton, is also listed as affected by the trail construction. Sunset Bridge Meadow, on North Avenue east of 1st Avenue, has trail access at the south end of the work zone. Parts of the trail between Fullerton and North close completely while crews are working, so check the Closures & Alerts page before you park at either one over Thanksgiving weekend.

A few minutes north, the trail mile that reopened in September

The work happening along Thatcher Avenue was finished on the next section north just two months ago. The Forest Preserves completed the Lawrence Avenue to Irving Park Road segment in September 2026. It was a $3.2 million project that rebuilt one mile of trail with two new elevated boardwalks and moved the path to higher, drier ground so it's usable year-round. A federal TAP-L grant covered $2.5 million, and Cook County Motor Fuel Tax funds paid the rest.

It's a short drive from River Grove, and both ends have parking that now connects to the trail with ADA-accessible paths:

  • Schiller Woods-West is entered from W Irving Park Road, with parking, trail access and several picnic groves, including a shelter at Grove 2.
  • Robinson Woods-South is entered from Lawrence Avenue west of N East River Road, with parking, trail access and two sheltered picnic groves.

The project also added a bench and a bike rack. Schiller Park did its part too. The Forest Preserves credits the Village of Schiller Park with securing an ITEP grant that paid for 90% of the detailed engineering design. That makes this mile a preview of what River Grove's segment will look like when its crews finish.

The walk is worth it in late fall even without the new boardwalks. The Forest Preserves describes Robinson Woods as a rest stop for migrating birds along the river corridor, with river bends, bluffs and views across the floodplain. Prescribed burns there have expanded small patches of remnant prairie. At Schiller Woods, the preserve's nature notes list winter wrens, American tree sparrows, brown creepers and chickadees among its birds, in a setting of woods, remnant prairie, sedge meadow and wetland.

If snow arrives early, Schiller Woods-East is the nearby preserve listed with sledding. It also has parking, trail access, fishing and five sheltered picnic groves. Schiller Woods is made up of east, west and south units plus Che Che Pin Qua Woods, which is on W Irving Park Road west of N Cumberland Avenue.

South end: Thatcher Woods and Trailside

The other good walk is south, where Thatcher Avenue crosses into River Forest. Thatcher Woods covers 245 acres along the river. Its entrance is on Chicago Avenue west of Thatcher Avenue, and it has parking, bathrooms, two picnic groves, one of them sheltered, and 4.9 miles of unpaved walking trails. The preserve includes floodplain forest, savanna and prairie, and volunteers are restoring the oak savanna at its southern end.

The Trailside Museum of Natural History is at the edge of those woods at 738 Thatcher Avenue, with its own parking lot. From November through February it's open 9 a.m. to 4 p.m. Monday through Thursday, Saturday and Sunday. It's closed Fridays and on Thanksgiving, Christmas and New Year's Day. Over the holiday weekend, that means it's closed Thursday, November 26, and Friday, November 27, and open Saturday and Sunday. Inside are live native animals, and outside are wildflower gardens. Feeding-time programs with its ambassador animals appear on the museum's calendar. The Thatcher Woods trails next to the museum are open sunrise to sunset.

The weekend's three dates, plus one in December

The museum is closed on Fridays, but its biggest event of the holiday weekend is on Friday. Trailside's free Annual Turkey Trot Hike starts at 1:30 p.m. on Friday, November 27, at 738 Thatcher Avenue. The event page invites hikers to "walk off that extra helping of turkey and stuffing" on a post-holiday hike for all ages. You have to register by contacting the organizer, and the listed phone number is 708-366-6530. If you plan to go, call before the holiday.

On Saturday, Trailside is open regular hours, 9 a.m. to 4 p.m., and both the river trails north of Irving Park Road and the Thatcher Woods loops are open sunrise to sunset. The full Des Plaines River Trail system is 28.4 miles of paved and unpaved sections. Near River Grove, the trail is mostly the unpaved Yellow Trail, so wear shoes you don't mind getting muddy in late November.

On Sunday, November 29, Trailside's calendar has a free guided trail walk for all ages, with registration required.

The next date on the calendar is Sunday, December 13. Trailside is hosting a free Christmas Bird Count owl-listening event led by John Elliot of Chicago Bird Alliance, for ages 10 and up, with registration required. It's a good reason to come back to Thatcher Woods after the holiday weekend.

What happens on the river after this weekend

The trail work along Thatcher Avenue is the middle piece of a longer plan, and the next piece is closer to River Grove's northern edge. The Forest Preserves splits the river trail into a North Section, from Touhy Avenue to Irving Park Road, and a South Section, from Irving Park Road to North Avenue. The South Section runs 4.9 miles and follows the river more closely. With the Lawrence-to-Irving Park mile finished, the North Section's segments are all done.

For the South Section, the plan is to move the trail about a mile east, closer to Cumberland. The Irving Park Road to Fullerton Avenue segment has $2.6 million in awarded ITEP grant funds. Its preferred route runs closer to Cumberland south of Irving Park Road, toward Forest Preserve Drive. Because of the expected cost, the Forest Preserves is pursuing it in two parts, Irving Park to Belmont and Belmont to Fullerton, and plans to apply for more grants for future construction.

Planning also extends south past North Avenue. The Forest Preserves has studied connecting the Des Plaines River Trail to the Illinois Prairie Path at Madison Street in Forest Park. The preliminary route is an on-street bike route along Thatcher Avenue in River Forest, and more funding is needed to finish that study.

The River Grove segment is set to finish around the end of 2027, and Thanksgiving 2027 may be too early to count on it. Until then, the new boardwalks at Schiller Woods-West and the oak savanna at Thatcher Woods are each a short drive from any block in town. For more on what's around town, see the River Grove neighborhood page and our fall post on Gene & Jude's and the Cernan Center.

If you live a few blocks from Thatcher Avenue, you'll watch this river trail get rebuilt over the next year. If you're also wondering whether to sell before or after the North Avenue crossing opens, start with a free home valuation from Frank Campobasso.

Work With Frank

Get assistance in determining current property value, crafting a competitive offer, writing and negotiating a contract, and much more. Contact me today.

Follow Me on Instagram